隧道开挖过程中,顶拱沉降观测是围岩变形监控量测的主要方法。文章结合京沪高铁西渴马隧道工程实践,介绍了顶拱沉降观测中采用的静力水准仪自动化测量法,并全面分析了此种新方法在观测精度、稳定性、特别是在自动化观测方面具有传统方法无法比拟的优势。
In the process of tunnel digging,the tunnel crown settlement monitoring is a major method in deformation monitoring.Combined with Xikema Tunnel of Beijing-Shanghai High Speed Rail,the hydrostatic level automated monitoring is introduced and the new method has unique advantages over the traditional one in observation precision,stability,especially in automated observations.