静安站500kV 16km超长电缆进线工程安装新技术 被引量:7

New Technology of Installing 500 kV 16 km Extra-long Cable In Wire in Jing-an Substation
原文传递
导出
摘要 介绍了目前世界上距离最长、中间接头数量最多的上海静安变电站500 kV电缆线路敷设工程概况。介绍了电缆敷设路径、电缆的基本结构、布置方式、电缆中间接头的结构、电缆接地方式。阐述了在电缆吊装运输及敷设中、电缆接头施工中、电缆测温以及验收中采用的新技术。 The general project situation of laying 500 kV cable lines,currently the longest distance with the most amounts of intermediate joints in the world,in Shanghai Jing-an substation was presented.The laying path,basic structure,layout mode,the intermediate joint structure and grounding mode of the cable were also described.The new technologies applied in the transportation and laying of the cable hoisting,the construction of the cable joints,the temperature measurement of the cable and the acceptance were elucidated.
机构地区 上海市电力公司
出处 《华东电力》 北大核心 2010年第4期465-468,共4页 East China Electric Power
关键词 上海电网 500KV电缆 500KV变电站 Shanghai power grid 500 kV cable 500 kV substation
  • 相关文献

同被引文献61

引证文献7

二级引证文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部