摘要
柏香林水电站是昭通洒渔河下游河段梯级的第二级电站,电站装机容量2×2.5万kW,引水隧洞总长8027m,主要介绍引水隧洞衬砌选择、水头损失的设计以及隧洞实施情况,并根据调整情况进行水损复核的结果。
The Baixianglin Hydropower Station is the second stage of the cascade power stations in the lower reach of the Saxi River for Zhaotong, with the installed capacity of 2 × 25 000 kW and length of water diversion tunnel 8 027 m.. The lining type selection of the tunnel, the design concerningwaterhead loss, and the situation of tunnel excavation were expounded, the examination of design schemes also analyzed.
出处
《电网与清洁能源》
2010年第2期84-88,共5页
Power System and Clean Energy
关键词
柏香林水电站
长引水隧洞
隧洞衬砌选择
水头损失
Baixianglin Hydropower Station
long waterdiversion tunnel
lining selection of the tunnel
water head loss