长江流域某污水处理厂的工艺改造 被引量:2

Process Reconstruction of a WWTP in Yangtze River Basin
下载PDF
导出
摘要 长江流域某污水处理厂采用A-A2/O工艺,在运行中存在TN偶然超标的现象,这主要与进水水质波动较大、C/N值有时偏低以及低温天气有关。为此,提出了关闭部分曝气装置、增设搅拌器、多点进水等解决措施。改造后,出水TN浓度大幅降低,达到了GB18918—2002的一级A标准,运行成本减少,管理更为方便。 During the operation of a WWTP using A-A^2/O process in Yangtze River basin, the elfluent TN occasionally exceeded the national standard due to large fluctuation of the influent quality, low C/N and low temperature weather. Therefore, corresponding measures of shutting down some aeration devices, adding mixers and step-feed were proposed. After the reconstruction, the effluent TN concentration is significantly reduced, achieving the class I -A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918 -2002). The operation cost is reduced, and the management is more convenient.
出处 《中国给水排水》 CAS CSCD 北大核心 2010年第4期35-37,共3页 China Water & Wastewater
基金 重庆交通大学引进人才基金项目(2006)
关键词 污水处理厂 低温 低C/N值 TN去除 工艺改造 WWTP low temperature and low C/N TN removal process reconstruction
  • 相关文献

参考文献2

  • 1张自杰 林荣忱 金儒霖.排水工程[M].北京:中国建筑工业出版社,1999.104-105. 被引量:41
  • 2任南琪,赵庆良主编..水污染控制原理与技术[M].北京:清华大学出版社,2007:489.

共引文献40

同被引文献23

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部