期刊文献+

南水北调工程PCCP管道设计的关键技术研究 被引量:20

Study on key design techniques of PCCP for South-to-North Water Transfer Project(Mid-route)
下载PDF
导出
摘要 在南水北调中线工程中采用了4 m直径的超大口径PCCP管道。文中总结介绍了该工程在管材设计、承插口构造、管线防腐蚀、管件设计、管线建筑物设计、管线水头损失计算、防止管线阻隔地下水、防止不均匀沉降等方面的设计关键技术。 The pre-stressed concrete cylinder pipe with the super-large diameter of 4 m is applied to the construction of the Midroute of the South-to-North Water Transfer Project ; for which the key design points in the aspects such as the design of pipe materials, the fabrication of the bell and spigot joint, corrosion resistance for pipeline, design of pipe fittings, design of structures along the pipeline, calculation of the head loss of pipeline, preventing pipeline from being a barrier of groundwater, control of uneven settlement, etc. are summarized and described herein.
出处 《水利水电技术》 CSCD 北大核心 2009年第11期33-39,共7页 Water Resources and Hydropower Engineering
基金 "十一五"国家科技支撑计划 南水北调若干关键技术问题研究与应用项目 超大口径PCCP管道结构安全与质量控制研究课题(2006BAB04A04)
关键词 南水北调工程 PCCP 承插口 防腐 阴极保护 水头损失 预应力钢丝 South-to-North Water Transfer Project pre-stressed concrete cylinder pipe bell and spigot faucet corrosion resistance cathodic protection head loss pre-stressed steel wire
  • 相关文献

参考文献8

  • 1北京市水利规划设计研究院.南水北调中线京石段应急供水工程(北京段)惠南庄-大宁段初步设计报告(修订本)[R].2004. 被引量:2
  • 2AWWA Manual M9, Concrete Pressure Pipe[ S]. 被引量:1
  • 3AWWA Manual M11, Steel Pipe: A Guide for Design and Installation [ S ]. 被引量:1
  • 4ANSI/AWWA C304 - 99, Standard for Design of Prestressed-Concrete Cylinder Pipe [ S ]. 被引量:1
  • 5ANSI/AWWA C301 -99, Prestressed Concrete Pressure Pipe, Steel- Cylinder Type, for Water and Other Liquids[ S]. 被引量:1
  • 6GB/T19685-2005,预应力钢筒混凝土管[S].中国国家标准化管理委员会. 被引量:16
  • 7张亚平,赵铁军主编..世界最大的输水工程 利比亚大人工河[M].北京:中国建筑工业出版社,2003:164.
  • 8NACE RP 0100 - 2004, Cathodic Protection of Prestressed Concrete Cylinder Pipeline [ S ]. 被引量:1

共引文献16

同被引文献125

引证文献20

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部