摘要
首次应用模糊数学的理论和方法建立了求解电力系统多目标非线性无功优化问题的新模型,使之转换成标准的线性规划问题,并巧妙地引用模拟退火算法,简化了计算,满足了实际工程的需求。
In VAR optimzation of power systems, this paper persent a new model for solwing multi-objective and nonlinear VAR optimization. This model is based on the theory of fuzzy set and transforms the problems into the linear progranming. By employing the Simulated Annealing the proposed algoritbe reduce: tbe execution time of optimization,adjusts the relation of objective fcnctions and satislying the demands of actual power Systems.
出处
《电力学报》
1998年第1期25-30,共6页
Journal of Electric Power