新安江水电厂水轮机进相试验研究 被引量:3

Phase-advance test and research on turbines of Xin'anjiang hydropower plant
下载PDF
导出
摘要 水轮发电机适时进相运行,能改善和抑制电网电压水平。通过对新安江水力发电厂4号机进相试验研究,指出发电机静稳极限、厂用电电压、定子端部结构件温升是发电机进相运行的主要限制条件。进相试验确定低励限制的范围,提高水轮发电机的进相运行能力。 Timely phase-advance operation of turbine-generators can improve and suppress the grid voltage level. Through phase-advance test and research on No. 4 Unit of Xin'anjiang hydropower plant, it shows that the static stability limit of generator, service power voltage and temperature rise of stator end elements are the main constraints for phase-advance operation of generators. The phase-advance test can determine the range of low excitation limit and improve the phase-advance operation capability of turbine-generators.
出处 《西北水电》 2009年第5期57-60,共4页 Northwest Hydropower
关键词 发电机 进相试验 电压调节 试验研究 generator phase-advance test voltage regulation test research
  • 相关文献

参考文献3

  • 1章卫光,吴正良.新安江水电厂运行规程(QJ/11300041.05.014.01-2007)[Z].新安江:新安江电厂,2007. 被引量:1
  • 2周鹗主编..电机学[M].北京:水利电力出版社,1995:480.
  • 3李福兴,徐鹏.新安江水力发电厂1~9号发电机组进相试验[R].华东电力试验研究院有限公司,2008. 被引量:1

同被引文献12

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部