摘要
水轮发电机适时进相运行,能改善和抑制电网电压水平。本文对李家峡水电站1#水轮发电机的进相运行试验进行分析,旨在找出水轮发电机进相运行的限制条件,以便提高水轮发电机的进相能力。
The voltage of electric networks may stable when hydroturbine generating operated in phase advance status. The phase advance test of No.1 hydroturbine generating unit are analyzed, in order to find out the limiting condition for the operation mode. Based on analysis, some personal ideas are put forward, which may provide foundation for the selection of generating units.
出处
《西北水力发电》
2002年第3期38-40,共3页
Journal of Northwest Hydroelectric Power