摘要
介绍了神华国华台山电厂600MW机组辅机故障快速减负荷逻辑回路的功能,对多次辅机故障快速减负荷功能试验过程进行了详细分析,针对试验中发现的问题优化有关逻辑并进行试验,根据实际试验结果提出相应的控制策略改进措施。
The function of run back (RB) control loop on 600 MW units of Shenhua Guohua Taishan Power Plant is introduced. The process of multiple RB tests is analyzed in detail. The optimization strategy for the problems encountered during the RB test is discussed, and corresponding measures for modifying the control strategy are offered according to actual test results.
出处
《广东电力》
2009年第8期72-75,共4页
Guangdong Electric Power