地铁暗挖隧道紧邻既有建筑物施工方案分析 被引量:5

Analysis of Construction Plan for Buildings Existing Close to Tunnel of Cocealed Trenching at Subway
下载PDF
导出
摘要 地铁区间隧道邻近既有建筑物,为保证既有结构的安全,对洞内注浆加固和隔离桩两种施工方案分析,采用数值模拟方法,通过对不同施工方案引起的既有结构沉降量比较,进而选择合理施工方案,以指导具体施工。实际施工监测成果表明,所选择的方案是合理的。 For existing buildings in the neighbouring of tunnel of subway between area and area, for the sake of ensuring safety of existing structure the analysis of construction plans for grouting reinforcement and isolation one is made, the contrast of settlements of existing structures bought above by different construction plan is performed, in addition the rational construction plan is selected to instruct specific construction. Results of monitoring the actual construction demonstrate selected plans are reasonable.
出处 《北方交通》 2009年第8期91-93,共3页 Northern Communications
关键词 区间隧道 既有结构 施工方案 沉降 监测 Tunnel between areas Existing structure Construction plan Settlement Monitoring
  • 相关文献

参考文献5

二级参考文献10

  • 1[1]夏明耀,曾进伦.地下工程设计施工手册[M].北京:中国建筑工业出版社,2002. 被引量:4
  • 2刘昌用 蒋中庸 王梦恕.试论城市地下工程浅埋暗挖技术.现代隧道技术,2002,:10-26. 被引量:2
  • 3关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2002.. 被引量:12
  • 4Forbes J, Finch A R Application of compensation grouting to the St.Clair River Tunnel Project [A]. In: Mair R J, Taylor R N ed.Geotechnical Aspects of Underground Construction in Soft Ground[C].Rotterdam: A.A. Balkema, 1996, 343~348 被引量:2
  • 5Lunardi P, Cassani G. Construction: of an underpass at the Ravone railway yard in the city of Bologna: aspects of the design and construction[A]. In: Teuscher P, Colombo A ed. Progress in Tunneling after 2000(Ⅲ)[C]. Bologna: Patron Editore, 2001, 319 ~ 被引量:2
  • 6Melis M, Trabada J, Ortiz J. Construction of a large cavern beneath existing buildings for the Madrid Subway [A]. In: Alten T ed.Challenges for the 21st Century(1)[C]. Rotterdam: A. A. Balkema,1999, 267-272 被引量:1
  • 7Shirakawa K, Aoki T, Fujii Y, et al. Excavation through semicircular-shaped shell formed by umbrella method at fault fracture zone beneath densely residential area[A]. In: Alten T ed. Challenges for the 21st Century(1)[C]. Rotterdam: A.A. Balkema, 1999, 4 被引量:1
  • 8施仲衡.地下铁道设计与施工[M].西安:陕西科学技术出版社,2002.. 被引量:37
  • 9陈力 潘若东 张育红.在建筑物下开挖地铁隧道的合理工法分析[A].见:史佩栋.海峡两岸岩土工程/地工技术交流研讨会--城市地下工程与环境保护(大陆卷)[C].北京:人民交通出版社,2002.145-149. 被引量:1
  • 10范国文 王先堂.暗挖双连拱隧道穿越浅基础高层楼群区施工技术[J].现代隧道技术,2002,39:88-95. 被引量:2

共引文献61

同被引文献33

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部