期刊文献+

山东莱州风电场风机塔架基础桩型选择 被引量:1

Wind turbine tower foundation pile type selection for Laizhou wind power farm
下载PDF
导出
摘要 针对山东莱州风电一期工程地处沿海地区,风电场地基为软基,承载力较小的特点,采用桩基础设计。通过桩型比选,布桩优化,最终方案为:每个基础采用17根预应力混凝土管桩,基础中心布置一根,内圈4根,外圈12根。 Laizhou Wind Power lst-Stage Project of Shandong province is located in coastal area. Pile foundation design is adopted because the wind farm falls on soft foundation with low bearing capacity. After comparison of pile types and optimization of pile layout, the final scheme was determined, with each wind turbine tower foundation consisting of 17 prestressed concrete tubular piles, one arranged in the center, 4 piles around the inner ring and 12 piles around the outer ring.
作者 胡玉贵 徐瑶
出处 《广西水利水电》 2009年第4期40-43,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 风电工程 桩基础 预应力混凝土管桩 Wind power project pile foundation prestressed concrete tubular pile
  • 相关文献

参考文献2

  • 1李敦仁,刘世君.莱州鲁能风电一期48.75MW工程施工图阶段岩土工程勘察报告[R].南宁:广西电力工业勘察设计研究院,2006. 被引量:1
  • 2中国建筑标准设计研究所.预应力混凝土管桩(03SG409)[M].北京:中国建筑标准设计研究所出版,2003. 被引量:1

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部