期刊文献+

延迟焦化装置节能改造及其效果 被引量:3

Energy Saving Modification of Delayed Coking Plant and its Result
下载PDF
导出
摘要 为适应常减压装置原油加工量的增加以及节能的要求,对延迟焦化装置进行消除瓶颈及节能改造。通过对加热炉、分馏塔和换热网络的一系列改造,装置处理能力由0.4 Mt/a扩大到0.9 Mt/a,每吨原料的加工能耗为26.0kg(标油)/t,下降1.98 kg(标油)/t。装置实现可调循环比操作,可操作性增强,达到了预期的改造目的。 Modification of bottleneck eliminating and energy saving was made on the delayed coking plant to respond the increase of crude oil processing capacity of atmospheric and vacuum distillation unit and the meet the demand of energy saving. Through a series of modification on the heating furnace, fractionating tower and heat exchanging net,the plant ' s processing capacity was expanded from 0.4Mt/a to 0.9Mt/a, and processing energy consumption for per ton material was 26.0kg of oil equivalent/t, with a decrease of 1.98kg of oil equivalent/t. The plant realized adjustable recirculating ratio operation, and the operability was improved, which gained the expected aim.
出处 《石油化工技术与经济》 2009年第4期54-57,共4页 Technology & Economics in Petrochemicals
关键词 延迟焦化 消除瓶颈 节能 改造 delayed coking, bottleneck eliminating, energy saving, modification
  • 相关文献

参考文献3

二级参考文献5

  • 1[1]NPRA AM-99-012 被引量:1
  • 2[2]Martin Hus. Visbreaking process has strong revival. Oil and Gas Journal, 1981,79(15): 109 ~ 120 被引量:1
  • 3[3]Teh Fu Yen. Fuel Science and Technology Intemational, 1992,10(4~ 6) :723 ~ 733 被引量:1
  • 4[5]NPRA AM-94-7 被引量:1
  • 5[6]Storm, David Anthony. Delayed Coking process with water and hydrogen donors. US, US 5 711 870.1998 被引量:1

共引文献17

同被引文献37

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部