摘要
为了满足生产需要,对某大型冶金企业炼钢厂浇铸跨进行了扩容改造实践,总结了起重机与起重机承轨梁同时升起的关键技术及施工方案,节约了施工成本,缩短了施工周期,为企业赢得了一定的经济效益。
In order to meet the requirement of product,Transformation practice of a Large steel mill for the expansion of cross-costing is carried out.The key technology and construetion programs are sumeed up.This can save consthution cost,shorten the cycle and win the economic benifit for the ecterprise.
出处
《机械管理开发》
2009年第4期56-56,58,共2页
Mechanical Management and Development
关键词
顶升
起重机
承轨梁
Crane
Support beam
Top up