摘要
结合京承高速公路时令河大桥预应力混凝土连续箱梁施工,介绍了六四式军用梁满堂支架设计与施工技术,重点说明了支架的选择布置和受力计算分析,为箱梁顺利施工提供了重要的技术保证。
Based on prestressed concrete continuous box girder construction for Shiling River Bridge of Jing- Cheng Expressway, an introduction is made of the design and construction technology of 64-type military beam full framing. Focused on the choice of framing deployment and force analysis, this paper provides an important technology reference for the successful construction of box beams.
关键词
箱梁现浇
支架
内力计算
cast-in-place box
framing
internal force calculation