随着电力项目的大力建设,山西省整个区域的生态环境也随之恶化,个别地区引发水土流失.通过对山西瑞光电厂项目建设过程中水土流失现状的了解,在全面勘察和分析的基础上,将该项目划分为四个水土流失防治分区:厂区建设防治区、线性设施防治区、贮灰场防治区和施工临时设施防治区,并就各防治分区做出典型的工程措施设计.
With the construction of the power system in Shanxi Province, the en 'vn'onment of the whole district is turning for the worse. In some parts it even leads to soil erosion. According to the research on the impact of the project construction for the characteristic of soft erosion in Ruiguang heat- engine plant, Shanxi, forward exhaustive investigating and analyzing, the author divided the projects into four parts industrial area, linear facilities, coal ash yard and temporary facilities. Then it do the typical design of engineering measure for every part, in order to avoid soil erosion from the projects construction effectively and supply reference for the same kind projects in Shanxi Province.
出处
《晋中学院学报》
2009年第3期1-5,共5页
Journal of Jinzhong University
关键词
电厂建设
水土流失
工程措施
Heat- engine Plant Construction
Soft Erosion
Engineering Measure