摘要
重点对深溪沟水电站导流洞原型监测的数据进行了分析,经过对施工期和运行期间的观测资料进行比较,评价了导流洞的运行安全情况和设计的合理性。
In this paper,more attention is paid to analysis of prototype observation data of diversion tunnel at Shenxigou hydropower station.By comparing observation data gained during construction and operation period,evaluations on diversion tunnel operation conditions and design justifications are provided.
出处
《四川水力发电》
2009年第3期118-119,共2页
Sichuan Hydropower