摘要 通过对深溪沟水电站导流洞洞身渗水原因分析和试验成果总结,针对渗水的具体情况采取高效、经济的堵、排结合的减渗措施,为工程建设节约投资500多万元,实现了预定的截流目标,取得良好的经济效益。 Based on the cause analysis of seepage of diversion tunnel of Shenxigou Hydropower Station and the summary on test results, we adopted high effective and economic seepage reduction measure of the combination of drainage and blockage in accordance with the concrete condition of seepage, which saved more than 5 million Yuan RMB of project investment and realized the expected goal of seepage interception and gained good economic benefits.
出处 《水力发电》 北大核心 2008年第9期34-36,39,共4页 Water Power
关键词 导流洞 施工期 渗水 研究 深溪沟水电站 diversion tunnel construction period seepage study Shenxigou Hydropower Station