摘要
结合北乡制梁场的实际情况,详细介绍了箱梁预制施工工艺和方法,重点对钢筋工序、模板工序和混凝土工序进行了阐述,以改进和提高箱梁的质量,达到既降低成本,又提高工效的目的。
The paper combines Beixiang beam line factory actual circumstance, detailedly introduces box beam preparing system construction craft and method, expatiates reinforcing bar work preface, template work preface and concrete work preface to improve and increase box beam quality, attains decline low cost and increases work effect purpose.
出处
《山西建筑》
2009年第15期115-116,共2页
Shanxi Architecture
关键词
箱梁
预制技术
钢筋
模板
混凝土
box beam, preparing technique, steel bar, template, concrete