基于挣值的项目管理激励合同 被引量:10

A Study on Earned-Value Based Incentive Contract of Project Management
下载PDF
导出
摘要 以挣值管理(EVM)中的计划差异(SV)和成本差异(CV)为基础,建立了一个简单但更综合的业绩测度,并基于该测度建立了委托-代理模型。通过该模型,证明了最优激励合同的存在性和惟一性,并给出了最优合同参数的计算方法。进一步分析了外生参数对激励效果(期望项目业绩)的影响。结果表明,给定其他参数,项目期望业绩:①随着代理人的能力水平的增加而提高;②随着代理人的风险厌恶程度的增加而降低;③随着项目外部环境的不确程度的增加而降低;反之亦然。 This paper constructs a simple but more comprehensive performance measure with the schedule variance (SV) and the cost variance (CV) and builds a principal-agent model based on the constructed performance measure. By the model, it proves the existence and uniqueness of the optimal incentive contract and provides the method to calculate the contract parameters. Further, the impacts of exogenous parameters on the expected project performance are analyzed. The results show that given the values of other parameters, the expected project performance, (1) increases as the agent's competency increases; (2)decreases as the agent's degree of risk aversion increases; (3) decreases as the uncertainty of the external environment of the project in question increases, and vice versa.
出处 《系统管理学报》 北大核心 2009年第2期147-152,共6页 Journal of Systems & Management
基金 教育部科学技术研究重点资助项目(105149) 教育部博士点基金资助项目(20030614011) 信息产业部软科学资助项目
关键词 项目管理 挣值 挣值管理 激励合同 project management earned value earned value management incentive contract
  • 相关文献

参考文献23

二级参考文献21

  • 1陈嗣成 冯虹.《新编统计学原理》[M].北京经济学院出版社,1996.. 被引量:1
  • 2Christensen D S. The costs and benefits of the Earned Value management process [ J ]. Acquisition Review Quarterly, 1998, Fall: 79-85. 被引量:1
  • 3Abba W Y. Earned Value management--reconciling government and commercial practices: for people involved in Earned Value[J]. Project Management, 1997, Special Issue :43-50. 被引量:1
  • 4Fleming Q W. Cost/Schedule Control Systems Criteria:the management guide to C/SCSC[M]. Chicago: Probus Publishing Co., 1992.75-87. 被引量:1
  • 5Project Management Institute. A Guide to Project Management Body of Knowledge[M]. PMI, 2000.87-95. 被引量:1
  • 6Cass D J. Earned Value program for DOE projects[A].AACE-I TRansactions-1998[C]. AACE-I, 1998. 187-194. 被引量:1
  • 7Christensen, Davis S., "The Costs and Benefits of the Earned Value Management Process", Acquisition Review Quarterly, Fall, 1998. 被引量:1
  • 8Project Management Institute, A Guide to Project Management Body of Knowledge, PMI, 1996 Edition & 2000 Edition. 被引量:1
  • 9Fleming, Quentin W., Cost/Schedule Control Systems Criteria: The Management Guide to C/SC-SC, Chicago, Illinois: Probus Publishing Co., 1992. 被引量:1
  • 10Cass, Donald J., "Earned Value Program for DOE Projects", AACE-I TRansactions, 1998. 被引量:1

共引文献212

同被引文献176

引证文献10

二级引证文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部