摘要
介绍了浙江电力调度数据网现状,通过分析现有网络存在的不足,指出了网络拓扑调整的必要性,提出三层网络架构的建设方案,包括网络的拓扑设计、技术体制、路由设计和应用接入等,并给出了节点设备配置的原则要求,希望为建设浙江电力调度数据网提供参考依据。
The paper briefly introduces Zhejiang power dispatching data network. It analyses the existing problems, puts forward the scheme of 3-layered architecture construction scheme, including network topology, technical system, route design and access modes, etc. The configuration of node equipment is also discussed in the paper. It has a reference value for the construction of Zhenjiang power dispatching data network.
出处
《电力系统通信》
2009年第5期24-28,共5页
Telecommunications for Electric Power System
关键词
电力调度数据网
拓扑结构
技术体制
路由
electric power dispatching data network
topology
technical system
route