用三维边界单元法解决基坑施工中非完整井降水的渗流计算问题,为降水方案设计提供依据。
The seepage calculation for partly penetrated well dewatering is solved in foundation pit construction by the three dimensional boundary elements method. This provides the basis for the scheme design of dewatering, and can make a prediction for dewatering process.