摘要
分析了攀钢热轧板厂加热炉内钢坯氧化烧严重的原因,提出了降低氧化烧损的措施.实施后使加热炉运行周期由原来的2个月提高到6个月以上。
Reasons for serious scale loss of slab in the heating furnace at Hot Strip Mill of Panzhihua Iron and Steel Co. were investigated. Measures to minimize the scale loss were proposed and exercised resulting in the increase of operation period of heating furnace from 2 to above 6 months.
出处
《钢铁钒钛》
CAS
北大核心
1998年第1期48-51,共4页
Iron Steel Vanadium Titanium
关键词
加热炉
钢坯
氧化烧损
heating furnace,slab,scale loss