期刊文献+

陕西省林木种苗工程管理及绩效评价 被引量:1

Seed and Seedling Project Management and its Performance Evaluation in Shaanxi
下载PDF
导出
摘要 本文从林木种苗工程绩效形成的机理出发,依据工程绩效评价指标的设计原则以及公共工程的特点,从林木种苗工程绩效的关键影响因素(成本、时间、质量)、工程生命周期和平衡计分卡这三个角度建立一套林木种苗工程执行绩效评价指标体系。并结合两个实际的项目,通过实践分析证明了它的可行性。 A performance evaluation index system was established in light of the formation mechanism of job performance and characters of public project. Influential factors to the seedling and seed project , life span of the project as well as balance car of records constituted an evaluation index system. Practical application for evidence was given too.
作者 赵宇 宋西德
出处 《陕西林业科技》 2008年第3期124-127,共4页 Shaanxi Forest Science and Technology
基金 陕西省林业厅"陕西省林木种苗工作站"
关键词 林木种菌工程 平衡计分卡 绩效评价模型 Seedling and seed project balance card of records performance evaluation model.
  • 相关文献

参考文献5

二级参考文献18

  • 1叶艳兵,费奇,丁烈云.支持复杂建设工程“精准建造”的项目持续分解模型[J].华中科技大学学报(城市科学版),2004,21(4):39-43. 被引量:3
  • 2MichaelEPorter著 陈小悦译.《竞争优势》[M].华夏出版社,1997.. 被引量:1
  • 3Kashiwagi Dean T; Savicky John: Identify the True Value of Construction[C] .47th Annual Meeting of ACCE International, Jun. 22-25 2003, Orlando, FL, US. P IT031-IT036. 被引量:1
  • 4Sobotka Anna: Simulation Modeling for Logistics Re-engineering in the Construction Company[J]. Construction Management and Economics, vol. 18, no.2, Mar, 2000, P183-195. 被引量:1
  • 5Rafiq M Y; Riley MM J: Rethinking IT for Rethinking Construction[C]. Towards A Vision for Information Technology in Civil Ehgineering,, 2003, P229-243. Towards A Vision for Information Technology in Civil Engineering: Proceedings of the Fourth Joint Symposium on Information Technology in Civil Engineering, Nov. 15-16 2003,Hashville, TN, US. 被引量:1
  • 6Arbulu Roberto J etc: Value Steam Analysis of A Re-engineered Construction Supply Chain [J]. Building Research and Information. Vol.31, No.2, March/April, 2003, P161-171. 被引量:1
  • 7A Rowe, P Smart, J Corley etc.: New Management Forms for Construction Projects [C]. 2002 IEEE International Engineering Management Conference ( IEMC-2000 ). Cambridge, UK. Vol. 1. P372-377. 被引量:1
  • 8David Otley,Performance management - a framework for management control systems research [J]. management accounting research, 1999, (10) :363 - 382. 被引量:1
  • 9James P. Lewis. Project planning, scheduling and control[M]. The McGraw- Hill Companies, Inc. 2001. 被引量:1
  • 10Hyun Jeong Choo. Distributed Planning and Coordination to Support Lean construction[D]. dissertation for doctor degree, University of Califorlia,Berkeley,2003.3. 被引量:1

共引文献11

同被引文献22

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部