支持复杂建设工程“精准建造”的项目持续分解模型 被引量:3

Lasting Decomposition Model of Supporting Lean Construction of Complex Construction Project
下载PDF
导出
摘要 持续的项目计划与控制,是复杂建设工程推行"精准建造"(LeanConstruction)的本质要求,与之相适应的工程项目分解也是一个持续动态的过程.分析了执行效能控制在复杂建设工程持续计划与控制中的核心地位,探讨了在以协同为特征的项目执行效能控制体系中采用本体论建模进行信息分解的必要性与可行性,提出了以效用本体论为中心的复杂建设工程项目分解结构体系构建策略,为进一步研究复杂建设工程本体论开发方法和持续计划与控制机制奠定了基础. Adopting last planning and control is an essential requirement to implement the 'lean construction' philosophy in complex construction project with which the corresponding project decomposition is a last and dynamic process. The core status of performance management in complex construction project last planning & control architecture is analyzed. The necessary and feasibility adopting the ontology-based modeling tool to implement the project information decomposition in project performance management system characterized as cooperation is discussed. The develop strategy for complex construction project decomposition structure system is proposed, which sets the performance ontology as the core item. A foundation is established for further research of the ontology development methodology and the last planning & control mechanism in complex construction project.
出处 《华中科技大学学报(城市科学版)》 CAS 2004年第4期39-43,共5页 Journal of Huazhong University of Science and Technology
基金 武汉市科技计划资助项目(20011007087-6).
关键词 持续 建设工程 项目执行 复杂 项目计划 效用 控制机制 分解模型 开发方法 建模 last decomposition ontology modeling project control complex engineering lean construction
  • 相关文献

参考文献2

二级参考文献1

  • 1[美国]防务系统管理学院著,国防科工委军用标准化中心.系统工程管理指南[M]宇航出版社,1992. 被引量:1

共引文献10

同被引文献11

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部