摘要
介绍白龙江立节水电站调压井开挖施工的特点、难点以及在开挖施工中采取的各种技术措施。
The paper presents the features and difficulties in excavation and support of the surge shaft of Lijie hydropower station on the Bailongjiang river, and describes various technical measures taken in excavation construction as well.
出处
《西北水电》
2008年第6期38-39,共2页
Northwest Hydropower
关键词
立节水电站
调压井
开挖施工
Lijie hydropower station
surge shaft
excavation construction