摘要
结合甘肃白龙江立节水电站厂房土建工程投标阶段施工进度计划的编制,阐述了P3进度项目管理软件的应用。
The application of project management software P3 was demonstrated based on plan preparation of Lijie Water Power Station Plant's civil engineering in Bailongjiang River of Gansu province.
出处
《长江工程职业技术学院学报》
CAS
2008年第1期49-50,共2页
Journal of Changjiang Institute of Technology
关键词
P3
施工进度计划
编制
应用
P3
plan of construction progression
preparing
application