期刊文献+

中小型钢铁企业生产物流分段管理模式及其应用 被引量:1

Production Logistics Subsection Management Mode and Its Application to Small and Medium-sized Iron and Steel Enterprises
下载PDF
导出
摘要 分析了中小型钢铁企业生产物流管理存在的普遍问题和生产物流的特点,建立以CPFR思想指导的生产物流管理规范和例外事件处理机制。应用JIT和MRPⅡ二种现代生产管理理论,构建了一套针对中小钢铁企业的生产物流推-拉分段管理模式:以MRPⅡ为主线,采用推式生产模式,进行连续生产阶段的生产计划的制定和生产物流控制;以JIT为主线,采用拉式生产模式,进行离散生产阶段的生产物流控制。X集团应用效果表明了该模式对生产物流相关指标改善的有效性。 This paper analyzes problems existing in small and medium-sized iron and steel enterprises production logistics management and characteristics of production logistics, establishes standards of production o logistics management and mechanism of exceptional event treatment based on collaborative planning forecasting and replenishment(CPFR). Two kinds of modem production management theories of Just-in-time (JIT)and manufacturing resource planning(MRP) are employed to construct a production logistics Pullpush subsection management mode for small and medium-sized iron and steel enterprises. In continuous production stages, push type production is used keruelled by MRPⅡ to make production plans and to control production logistics. In discrete production stages, pull type production is used kernelled by JIT to control production logistics. The mode is applied to X Group with effective results.
出处 《工业工程》 2008年第6期54-58,共5页 Industrial Engineering Journal
关键词 生产物流 联合计划预测与补给 准时制造 制造资源计划 production logistics collaborative planning forecasting and replenishment (CPFR) just-intime (JIT) manufacturing resource planning (MRP)
  • 相关文献

参考文献10

二级参考文献27

  • 1梁波,李怀祖,孙林岩.生产作业计划理论及应用的评述[J].系统工程理论方法应用,1996,5(2):9-17. 被引量:12
  • 2SCHONBERGER R J 陈明德(译).日本式的生产管理技术--刚好及时和全面品管制度[M].台北:新世界出版社,1983.. 被引量:2
  • 3王夏生 陈秋双.Job shop调度问题中优先规则的性能评价[M].南开大学,1993.. 被引量:1
  • 4李中勤,李大金,杨大葳.国有企业转换机制、进行体制变革的一条有效途径[J].重庆工业管理学院学报,1997,11(1):30-37. 被引量:1
  • 5HT Papadopoulos, MI Vidalis. Minimizing WIP inventory in reliable production lines [ J ]. Int , J, Production Economics, 2004,70:185-197. 被引量:1
  • 6Richardbcase Nicholasuilano F.RobertJacobs 宋国防译.生产与运作管理[M].北京:机械工程出版社,1999.744-755. 被引量:1
  • 7Robert A. Leitch . Effect of stochasticity, capacity and lead time cost drivers on WIP and producion environment [ J]. Management Accounting Research, 2001,12:167-196. 被引量:1
  • 8TJNye, EM, Jewkes DM, Dilts. Optimal investment in setup reduction in manufacturing systems with WIP inventovies [ J]. European journal of Operational Research, 2001,135:128-141. 被引量:1
  • 9Martin Haller , Andreas Peikert, Josef Thoma. Cycle time management during production ramp-up [ J]. Robotics and Computer Integrated Manufacturing, 2003,19:183-188. 被引量:1
  • 10Yu-Hsin Lin, Ching-En Lee. A total standard WIP estimation method for wafer fabrication[ J]. European Journal of Operational Research, 2001,131:78-94. 被引量:1

共引文献108

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部