期刊文献+

资源受限的离散时间/成本平衡问题及其遗传算法求解 被引量:8

Resource-constrained DTCTP and its genetic algorithm solution
下载PDF
导出
摘要 针对现代企业中多数项目主要使用可更新资源的特点,对经典离散时间/成本平衡问题进行了扩展,提出一种资源受限的离散时间/成本平衡问题模型。该模型参考了资源受限项目调度问题,强调了可更新资源的利用。基于可更新资源和不可更新资源计算项目成本,为每个项目活动引入压缩执行方式,在压缩执行方式下,加大不可更新资源的投入,可以缩短项目工期。根据模型的特点,提出一种求解该模型的改进遗传算法,并验证了算法的有效性。最后,通过计算工期底线问题,绘制时间/成本曲线,并基于计算结果讨论了该模型的优越性。 Aiming at the fact that renewable resources were used in majority projects in modern enterprises, the classic Discrete Time/Cost Trade-off Problem(DTCTP) was extended and a new Resource-Constrained DTCTP model (RC-DTCTP) was proposed. With reference to the Resource Constrained Project Scheduling Problem (RCPSP), the renewable resources were emphasized in this model. The project cost was calculated based on both renewable re- sources and non-renewable resources. Each activity could be executed in the compressed mode in which the non-re- newable resources were devoted to shorten the activity duration. According to the characteristics of the model, an improved genetic algorithm was presented to solve this model and its effectiveness was verified. Finally, an entire time cost tradeoff curve for a project network was drafted by solving project deadline problem, and the advantages of this model were discussed based on the computation results.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2008年第11期2155-2160,共6页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(60604025)~~
关键词 项目管理 离散时间/成本平衡 遗传算法 计划与调度 project management discrete time/cost trade-off genetic algorithm planning and scheduling
  • 相关文献

参考文献15

  • 1HINDELANG T J, MUTH J F. A dynamic programming algorithm for decision CPM networks[J]. Operations Research, 1979, 27(2) :225-241. 被引量:1
  • 2PRABUDDHA D E, DUNNE E J, GHOSH J B, et al. Complexity of the discrete time-cost tradeoff problem for project networks[J].Operations Research, 1997, 45(2) :302-306. 被引量:1
  • 3DEINEKO V G,WOEGINGER G J. Hardness of approximation of the discrete time cost tradeoff prohlem[J].Operations Research Letters, 2001, 29 (5) :207-210. 被引量:1
  • 4PATTERSON J H, HARVEY R T. An implicit enumeration algorithm for the time/cost tradeoff problem in project network analysis[J]. Foundations of Control Engineering, 1979, 4(2):107-117. 被引量:1
  • 5DEMEULEMEESTER E, HERROELEN W, ELMAGHRABY S E. Optimal procedures for the discrete time/cost trade off problem in project networks[J]. European Journal of Operational Research, 1996, 88(1) :50-68. 被引量:1
  • 6DEMEULEMEESTER E, DE REYCK B, FOUBERT B, et al. New computational results on the discrete time/cost trade -off problem in project networks[J]. Journal of the Operational Research Society, 1998, 49(6):1153-1163. 被引量:1
  • 7ERENGUC S S, AHN T, CONWAY D G. The resource constrained project scheduling problem with multiple crashable modes: an exact solution method[J]. Naval Research Logistics, 2001, 48(2):107-127. 被引量:1
  • 8SKUTELLA M. Approximation algorithms for the discrete time-cost tradeoff problem[J]. Mathematics of Operations Research, 1998, 23(4) :909-929. 被引量:1
  • 9刘士新,王梦光,唐立新,聂义勇.一种求解工程调度中时间/成本权衡问题的遗传算法[J].东北大学学报(自然科学版),2000,21(3):257-259. 被引量:9
  • 10张静文,徐渝,柴国荣.项目进度中的离散时间-费用决策问题研究[J].系统工程学报,2007,22(2):122-127. 被引量:10

二级参考文献10

  • 1Erenguc S S,Tufekci S,Zappe C J.Solving time/cost trade-offs problem with discounted cash flows using generalized benders decomposition[J].Naval Research Logistics,1993,40(1):25-50. 被引量:1
  • 2De P,Dunne E J,Ghosh J B,et al.The discrete time-cost trade-off problem revisited[J].European Journal of Operational Reseorch,1995,81(2):225-238. 被引量:1
  • 3Vanhoucke M,Demeulemeester E,Herroelen W.Discrete time/cost trade-offs in project scheduling with time-switch constraints[J].Journal of Operational Research Society,2002,53(7):741-751. 被引量:1
  • 4Prabuddha D,James D,Jay B G,et al.Complexity of the discrete time-cost trade-off problem for project networks[J].Operations Research,1997,45(2):302-306. 被引量:1
  • 5Alcaraz J,Maroto C,Ruiz R.Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms[J].Jouranl of Operational Research Society,2003,54(3):614-626. 被引量:1
  • 6Jozefowska J,Mika M,Rozycki R,et al.Simulated annealing for multi-mode resource-constrained project scheduling problem[J].Annals of Operations Research,2001,102(1-4):137-155. 被引量:1
  • 7Hartmann S.Project scheduling with multiple modes:A genetic algorithm[J].Annals of Operations Research,2001,102(1-4):111-135. 被引量:1
  • 8Demeulemeester E,Elmaghraby S E,Herroelen W.Optimal procedures for the discrete time/cost trade-off problem in project networks[J].European Journal of Operational Research,1996,88(1):50-68. 被引量:1
  • 9刘士新,王梦光.多资源受限工程网络的随机生成器[J].东北大学学报(自然科学版),1997,18(5):494-497. 被引量:2
  • 10汪嘉旻,孙永广,吴宗鑫.净收益最大化的时间-费用交换问题研究[J].系统工程学报,2000,15(3):267-271. 被引量:8

共引文献17

同被引文献61

  • 1刘士新,宋健海,唐加福.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,32(1):60-66. 被引量:63
  • 2蒋景楠,余斌.多项目管理探究[J].技术经济与管理研究,2006(2):83-85. 被引量:45
  • 3张静文,徐渝,何正文,柴国荣.项目调度中的时间-费用权衡问题研究综述[J].管理工程学报,2007,21(1):92-97. 被引量:24
  • 4HARTMANN S, BRISKON D. A survey of variants and extensions of the resource-constrained project scheduling problem [J]. European Journal of Operational Research,2010,207(1) : 1-14. 被引量:1
  • 5PRABUDDHA D, JAMES D, JAY B G, et al. Complexity of the discrete time-cost tradeoff problem for project networks [J]. Operations Research, 1997,45(2) :302-306. 被引量:1
  • 6ERENGUC S S, AHN T, CONWAY D G. The resource constrained project scheduling problem with multiple crashable modes: an exact solution method[J]. Naval Research Logistics,2001,48(2) : 107- 127. 被引量:1
  • 7VANHOUCEK M. New computational results for the discrete time/cost trade-offs in project scheduling with time-switch constraints[J]. European Journal of Operational Research, 2005,165(2) :359-374. 被引量:1
  • 8ALCARAZ J, MAROTO C, RUIZ R. Solving the multi mode resource-constrained project scheduling problem with genetic algorithms[J]. Journal of Operational Research Society,2003, 54(3) :614- 626. 被引量:1
  • 9HE Zhengwen, WANG Nengming, JIA Tao, et al. Simulated annealing and tabu search for multi-mode project payment scheduling[J]. European Journal of Operational Research, 2009,198(3) : 688-696. 被引量:1
  • 10DE P, DUNNE E J,GHOSH J B, et al. the discrete time/cost trade-off problem revisited[J]. European Journal of Operational Research, 1995,81 (2) :225-238. 被引量:1

引证文献8

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部