摘要 详细介绍了600MW超临界汽轮发电机组调试过程中,在油系统、调节保安系统,凝结水系统和轴系振动等方面发生的多个异常情况。通过现场计算分析和故障诊断,或者通过更改相应部分的设计,消除了上述故障或隐患,保证机组顺利完成168小时试运转,提高了机组的安全稳定性,上述成功的经验可供同类机组启动调试时借鉴和参考。 The subject of this study is to expound the abnormal issues occurred in lubrication oil system, control & protecting system, condensate water system and shafting vibration. The failure and hidden troubles mentioned above are eliminated by on-site calculation analysis and fault diagnosis, or by applying some revised design, so that the unit has passed the 168 trial operation successfully with good safety and stability. The above successful experience can be regarded as an example for commissioning in same kind of units.
作者 田国成
机构地区 山东电力研究院
出处 《热力透平》 2008年第4期264-268,共5页 Thermal Turbine
关键词 超临界汽轮发电机组 调试 异常情况 分析与诊断 supercritical turbine-generator set commissioning abnormal case analysis and diagnose
  • 相关文献

参考文献6

二级参考文献1

  • 1北京热电总厂.高压汽轮机运动[M].北京:水利电力出版社,1984.. 被引量:1

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部