摘要
以通过煤矿塌陷区的架空敷设供热管道为研究对象,对通过塌陷区边界采用常规非预应力安装的管道进行了危险性分析,采取了适当缩短支架间距及预应力安装的解决方法。
Taking the overhead,heating pipeline passing across the coal mine subsidence area as research object, the risk of conventionally installed (without prestress ) pipeline passing across the boundary of subsidence area is analyzed..The solving methods include appropriately shortening the space between the supports and using prestress installation.
出处
《煤气与热力》
2008年第12期16-19,共4页
Gas & Heat
关键词
煤矿
塌陷区
供热管道
支架
断裂带
沉降
预应力安装
coal mine
subsidence area
heating pipeline
support
fracture zone
sedi- mentation
prestress installation