摘要
结合武广客运专线箱梁预制施工及以往制梁的施工经验,介绍了武广客运专线时速350 km的预制混凝土箱梁施工质量控制要点及关键技术控制措施,并不断强化质量管理,从而确保制梁工作顺利进行。
Combining with constructing experience of passenger traffic special line box beam prefabricated construction and former making beam of Wu-Guang, it introduces prefabricated concrete box beam constructing quality controlling points and key technical controlling measures of Wu-Guang passenger traffic special line whose speed is three hundreds and fifty kilometers per hour, and continually consolidates quality management, in order to ensure the work of making beam smoothly.
出处
《山西建筑》
2008年第32期214-215,共2页
Shanxi Architecture
关键词
箱梁预制
梁场规划
设计
优化管理
质量控制
box beam prefabrication, beam field plan, design, optimizing management, quality control