期刊文献+

700 MW机组高压加热器运行分析

Analysis on high-pressure heater operation of 700 MW
下载PDF
导出
摘要 针对700 MW机组高压加热器系统投产运行的情况进行深入的分析,对出现的问题提出了解决方案,并对有问题的设备进行改造。通过对高压加热器水位运行优化来减少高压加热器的端差,提高了高压加热器经济运行水平。 According to the analysis on 700 MW unit high-pressure heater system commission and operation, improvement measure were proposed. Moreover, equipments with faults were reformed. Through optimizing high-pressure heater operational parameters, the high-pressure terminal difference was decreased and economic operation was improved.
作者 邹建华
出处 《江西电力》 2008年第4期40-42,44,共4页 Jiangxi Electric Power
关键词 高加 疏水 端差 控制 high-pressure hydrophobic interaction terminal difference control
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部