介绍湖北省输变电工程公司针对近年来工程建设任务重、时间紧、标准高的特点,切实强化工程创优管理,从前期策划准备、施工过程控制、工程竣工验收、档案移交、售后服务等各个环节抓起,将工程创优目标实施的资源配置和各种监督、检查、考核等措施均列入了过程管理范畴,使变电站创优管理工作自始至终保持在可控、在控、能控的状态,确保了变电站工程创优目标的实现。
Hubei electric power transmission & distribution engineering Co. has been directed against the urgent, heavy, and high-standard construction tasks for recent years, and to create an excellent management has been really strengthened. The process includes the earlier stage preparation planning,constructuin process control,completion acceptance, file handover and service after sale. The resource configuration of carrying out the goal of excellent management and every kind of supervision, checking, are listed into the scope of process management. Thus to create an excellent management of substation is kept in a controllable, on control, can be controlled condition.
出处
《湖北电力》
2008年第4期53-55,共3页
Hubei Electric Power
关键词
变电站
电网
创优管理
substation
electric network
to create an excellent management