摘要
通过对兰州东750 kV变电站的调研,并与500 kV变电站施工的分析对比,阐述了在特高压施工中架构组立、GIS设备的安装、引连线制作、变压器的安装、高压试验等的重点、难点。
Special high-voltage has been seen as the main project for our country's electrical construction on the net step. This article bases on the investigation the 1.anzhou east 750 kV transmission station and its comparison with 500 kV transmission station construction, and states the main and hard points in terms of framework component during the special high voltage construction, installation of GIS equipments, making lead wire splice, installation of transformer and voltage experiments.