大型专业工程船舶的技术改造——专用铺排船改造成打桩船 被引量:1

Technical Renovation of Large Special Working Vessels Conversion of Special Soft Mattress Laying Ships into Floating Pile Drivers
下载PDF
导出
摘要 为充分利用退役的大型工程船舶,增加海上桩基工程的市场竞争力,需将原"铺排1号"、"铺排2号"改造成"打桩19号"和"打桩20号"。文章对其中打桩系统的改造作了介绍,结果表明:改造的打桩船性能和质量达到了设计要求,改造周期显著缩短,改造成本降低,且具备柴油打桩锤和液压打桩锤的互换性。 To make full use of the demobilized large special working vessels and to increase the market competitiveness for offshore piling works, it is necessary to renovate Mattress Laying Ship No. 1 and Mattress Laying Ship No.2 into Floating Pile Driver No.19 and Floating Pile Driver No.20. The paper gives a description of the renovation of the pile driving system and the resuits showed that the performance and quality of the renovated floating pile drivers met the design requirements, the renovation period was shortened, the cost of renovation was cut down and the diesel and hydraulic pile hammers were interchangeable.
作者 高大伟
出处 《中国港湾建设》 北大核心 2008年第4期72-76,共5页 China Harbour Engineering
关键词 铺排船 技术改造 打桩船 桩架 mattress laying ship technical renovation floating pile driver piling frame
  • 相关文献

参考文献1

共引文献1

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部