摘要
结合具体工程实例,提出了铁路大桥40 m箱梁梁体架设的工艺流程图,详细介绍了节段拼装所采用的造桥机的构造、使用及梁段拼装施工过程中的关键技术,为今后箱梁的节段拼装施工积累了经验。
Combined with the specific project examples, it puts forward the technological process of the box erector of 40 m box beam railway bridge, and introduces the components and utility of the machine of manufacturing the bridge that used in section consolidation and the key technique in the construction process of beam section consoldation, and this accumulates the experiences to the section consolidation construction of box beam after.
出处
《山西建筑》
2008年第18期313-314,共2页
Shanxi Architecture
关键词
箱梁
节段拼装
造桥机
施工
box beam, section consolidation, the machine of manufacturing the bridge, construction