摘要
基于电网现状进行潮流计算,对漳泽电厂机组关停引发的一系列问题进行分析,提出长治北部电网运行方式(包括检修方式)调整方案及应对措施,为电网规划提供依据。
Based on the power flow calculation in the circumstances of electric network, a series of issues generated by the close of Zhangze electric units are analyzed, adjustment measures and suggestions of run manner of northern Changzhi network, including service manner are put forward, which proposes conditions to electric network plan.
出处
《山西电力》
2008年第2期10-12,共3页
Shanxi Electric Power
关键词
电网
运行方式
对策
规划
electric network
running manner
effective measurer plan