摘要 朱家岩隧道进口段岩土稳定性差、地形坡度大,成洞困难,施工中采用长管棚支护进行预加固处理.对长管棚支护参数、注浆参数、施工工艺进行了介绍.实践证明:应用长管棚超前加固朱家岩隧道进口段是成功的,保证了施工安全、缩短施工工期、保证了工程质量. The poor wall rock stability and steep grade of the exit section of Zhujiayan tunnel make tunneling hard, thus the supporting technology is applied to pre-reinforced measure. The long pipe & shed designing parameters, casting param- eters and construction technic are introduced. It is proved to be successful to apply long pipe & shed pre-reinforced sup- porting technology to treat Zhujiayan tunnel exit section, making the tunnel secure, reducing the construction time and ensuring its quality.
出处 《华东交通大学学报》 2008年第1期28-31,共4页 Journal of East China Jiaotong University
关键词 隧道工程 不良地质 长管棚支护 施工工艺 tunnel engineering poor geological condition long pipe & shed supporting construction technigue
  • 相关文献

参考文献4

共引文献1153

同被引文献19

引证文献7

二级引证文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部