基于模糊理论的工程项目承包风险定量分析 被引量:1

Quantitative analysis on risk of project contracting based on fuzzy theory
下载PDF
导出
摘要 运用风险管理理论对工程项目承包进行风险辨识,找出工程项目投标、合同谈判、项目施工、竣工验收等阶段所构成的工程项目承包全过程中的风险因素;提出定量分析方法,进行风险估计,获得各风险事件风险值;找到风险控制措施,以工程项目承包盈利为目的,把风险可能造成的损失控制在最低限度。 In this paper,firstly,with the method of risk management,risk identification is carried out to find out the risk factors in the process of project contracting which includes project biding ,contract negotiation,project construction and project acceptance. Secondly, a quantitative analysis method is put forward to estimate the risk values. Lastly, risk control measures are proposed to diminish the loss under the lowest possible limitation,in order to get optimal profit of project contracting.
出处 《辽宁工程技术大学学报(社会科学版)》 2008年第2期160-162,共3页 Journal of Liaoning Technical University(Social Science Edition)
关键词 风险 模糊理论 工程项目承包 定量分析 risk fuzzy theory project contracting quantitative analysis
  • 相关文献

参考文献3

  • 1唐坤,卢玲玲.建筑工程项目风险与全面风险管理[J].建筑经济,2004,25(4):49-52. 被引量:81
  • 2[2]Chapman.C B.Identification and estimation of risk:issues and illustrations from North Sea and arctic engineering projects[J].IFAC Proceedings Series.1985(7):213-219. 被引量:1
  • 3[5]Wu Cisheng.The forecast models tO the loss risk probability and its application in the accident analysis[J].Application of Statistics and Management,1997.16(1):26-29. 被引量:1

二级参考文献5

  • 1国际咨询工程师协会FIDIC.施工合同条件[M].机械工业出版社,1999年第1版.. 被引量:1
  • 2项目管理协会PMI.项目管理知识体系指南[M].项目管理协会有限公司,2000年版.127-146. 被引量:1
  • 3吴泗宗 唐坤.上海海港新城大型项目进度与投资控制研院[Z].,2003.. 被引量:1
  • 4吴泗宗 唐坤.中建8局大型建筑企业的现代化管理与现代化施工管理研究报告[R].同济大学经济与管理学院,2003.. 被引量:1
  • 5王兴华.风险管理与保险在二滩工程中的应用[J].水力发电,2002,28(7):4-8. 被引量:6

共引文献80

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部