3[3]Eguchi K,Teranishi K,Nakagome A,Kishimoto H.Application of recycled coarse aggregate by mixture to concrete construction[J].Construction and Building Materials.2007,21(7):1542~1551 被引量:1
4[4]Limbachiya M C,Marrocchino E,Kouiouris A.Chemical-mineralogical characterization of coarse recycled concrete aggregate[J].Waslz Management,2007,27(2):201~208 被引量:1
5[5]Evangehsm L,Brito J.Mechanical behavior of concrete made with fine recycled concrete aggregates[J].Cement & Concrete Composites.2007,29(5):397~401 被引量:1
7U.S.Department of Energy. The Future of Geothermal Energy[EB/OL]. http://www 1.eere.energy.gov/geothermal/ future_geothermal.html, 2013 -01-25. 被引量:1
8STEPHANIE FRICK,MARTIN KALTSCHMITY,GERD SCHRODER.Life cycle assessment of geothermal binary power plants using enhanced low-temperature reservoirs [J]. Energy,2010,35(5) :2281-2294. 被引量:1
9LtDA GERBER,FRANIOIS MARlCHAL.Environomic optimal configurations of geothermal energy conversion systems:Application to the future construction of enhanced geothermal systems in Switzerland[J].Energy, 2012,45(1) :908-923. 被引量:1
10MARTINO LACIRIGNOLA, ISABELLE BLANC. Environmental analysis of practical design options for enhanced geothermal systems (EGS) through life-cycle assessment [J].Renewable Energy, 2013,50 (2) : 901 - 914. 被引量:1