摘要
在分析我国目前最高电压等级750kV输变电示范工程建设的技术难点和特点的基础上,研究了利用科研成果中的技术创新在工程设计、设备制造、施工及验收中的应用,为后续750输变电工程和国家电网特高压输变电工程的建设提供了技术参考。
Based on the analysis of the technical difficulties and features for 750 kV Transmission and Transformation Demonstration Project, Which is the highest voltage level in China at present,the application of technical innovation obtained in the research achievements in the aspect of project design, equipment manufacture, construction and acceptance are studied, which has provided technical reference for the construction of future 750 kV transmission and transformation project as well the ultra-high voltage project of State Grid.
作者
衣立东
YI Li-dong (Northwest China Grid Company, Xi'an 710048, China)
关键词
750
KV输变电示范工程
技术创新
应用
750 kV Transmission and Transformation Demonstration Project
technical innovation
application