1Leonard D. A. , Guillcrmo F. S. Project - based course for integration of design and construction at WPI [ J ]. Journal of Professional issues in Engineering Education and Practice,1998, 124(4) : 97 - 104. 被引量:1
2David C. Brown, Melanie J. Ashleigh, Michael J. Riley.New project procurement process [ J ]. Journal of Management in Engineering, 2001, 17(4) : 192-201. 被引量:1
3Shing - Tao Chang. Reasons for cost mad schedule increase for engineering design projects [ J ]. Journal of Management in Engineering, 2002, 18(1) : 29 -36. 被引量:1
4Douglas D. Gransberg, William D. Dillon, Lee Reynolds,Jack Boyd. Quantitative analysis of partnered project performance[ J ]. Journal of Construction Engineering and Management, 1999, 125(3): 161-166. 被引量:1
5Egan J. S. Rethinking Construction [ M ]. Construction Task Force report, Department of the Environment, Transport andthe Regions, London, 1998. 被引量:1
6Stevens G. C. Integrating the Supply Chain [ J]. International Journal of Physical Distribution and Material Management,1989, 19(8) : 3 -8. 被引量:1
7Cooper M. C. , Ellram L. M. Characteristics of supply chain management and the implications for purchasing and logistics strategy [ J ]. International Journal of Logistics Management,1993, 4(2) : 13 -24. 被引量:1
8Dainty A. , Briscoe G. H. , Millet S. New perspectives on construction supply chain integration [ J ]. Supply Chain Management: An International Journal, 2001,6(4) : 163 -173. 被引量:1