摘要
结合郑西铁路客运专线黄龙村隧道地表裂缝的处理过程,对浅埋大断面黄土隧道施工中出现的地表裂缝原因进行了分析,提出了该类隧道地表裂缝的防治措施,可为同类工程提供参考。
This paper presents an analysis of the cause of the cracks occurred in the ground surface of the Ground Surface of Large Section Shal- low-buried Loess Tunnel in Huang Long village section of Zhengzhou-Xi'an dedicated railway passenger line, and put forward the measures to avoid and eliminate such cracks in the similar con- struction work.
出处
《现代城市轨道交通》
2007年第3期29-31,共3页
Modern Urban Transit