漫湾水电站二期工程地下厂房岩壁吊车梁设计 被引量:5

The Design of Concrete Crane Girder Bolted to Rockface of the Second-phase Works of Manwan-Ⅱ Hydropower Station Project
下载PDF
导出
摘要 漫湾水电站二期工程地下厂房吊车梁采用岩壁吊车梁结构。设计采用刚体力系平衡法和有限元法进行计算,并借鉴了鲁布革等水电站岩壁吊车梁设计的成功经验。针对漫湾工程岩壁吊车梁地段地质条件较差的问题,设计中采用了混凝土置换等措施进行加强锚固。通过承载试验成果及一段时间的运行表明,岩壁吊车梁体形及锚固措施设计是合理的。 The crane girder of the second-phase Project of Manwan Hydropower Station in underground powerhouse is concrete girder bolted to rock-face, During design, the FEM & forces balanced of rigid body are applied, and absorbed the successful experiences of concrete girder bolted to rock-face. Encountered with the poor geological conditions at the girder base, the concrete replacement measure is adopted to strengthen to surrounding rock mass. Through bearing capacity test and quite a long period of operation, the structure and anchorage measures of concrete crane girder are proved to be reasonable.
出处 《水力发电》 北大核心 2007年第5期72-74,共3页 Water Power
关键词 岩壁吊车梁 锚固设计 承载试验 漫湾水电站二期工程 concrete girder bolted to rock-face anchorage design bearing capacity test Second-phase project of Manwan Hydropower Station
  • 相关文献

同被引文献27

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部