摘要
重点分析了ZCS电流型移相全桥DC/DC变换器的启动工作过程,通过在升压电感上附加一个耦合线圈,改进了变换器的启动特性;并给出了实验结果。
The startup procedure of the current-fed phase shift full bridge (PSFB) zero current switching (ZCS) DC/DC converter is analyzed. The experiment results which satisfy the requirement of the ZCS DC/DC converter are also given at the end.
出处
《电源技术应用》
2007年第3期1-4,共4页
Power Supply Technologles and Applications