根据赣州市污水处理厂章江北岸截污干管工程过章江水下沉管的施工实践,阐述了沉管施工技术中的钢管制备与检查、测量放线、沟槽开挖、钢筋混凝土枕梁沉放、托管、沉管,以及选址和沉管质量控制。
The pipe-sinking construction technique has been put forward in this paper according to the case of Zhang River north bank intercepting sewer project by Zhangzhou Sewage Treatment Works. Several key points are introduced such as preparation & detection of steel pipe, surveying setting out work, trench excavation, reinforced concrete sleeper beam settlement and so on.
出处
《中国市政工程》
2006年第6期51-52,共2页
China Municipal Engineering
关键词
截污千管
沉管施工技术
钢管
intercepting sewer
pipe-sinking construction technique