摘要
本文通过描述朗讯公司SLM-2000和ISM-2000传输设备的割接案例,阐述传输设备工程割接的方法和实施步骤。
Describing a cut-over cases with SLM-2000 and ISM-2000 transmission equipment of lucent corporation, expatiates methods and implementation steps of transmission equipment engineering cut-over.
出处
《电信工程技术与标准化》
2006年第11期56-60,共5页
Telecom Engineering Technics and Standardization
关键词
传输设备
工程
割接
transmission equipment, engineering, cut-over