摘要
通过对溪洛渡水电站3号泄洪洞的掺气特性分析,提出了通过修改掺气段的布置和掺气坎的体型来提高掺气浓度的优化方案,并对优化方案的掺气特性进行了分析。
After studying the No. 3 spillway tunnel's aeration properties for Xiluodu hydropower station, this paper brought forward an optimized scheme to enhance the aeration consistency through modifying the frame of aeration sect and the shape of aeration flip bucket. It also analysed the aeration properties of this optimized scheme.
出处
《黄河水利职业技术学院学报》
2006年第4期1-4,共4页
Journal of Yellow River Conservancy Technical Institute
关键词
溪洛渡
泄洪洞
高速水流
掺气保护
优化方案
Xiluodu
spillway tunnel
high- speed flow
aeration properties
optimized scheme