7Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: a case study [ J]. Iternational Journal of Project Management, 1999,17(4) : 249-256. 被引量:1
8Gwang-Hee Kim, Sung-Hoon An, Kyung-In Kang. Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning [J]. Building and Environment, 2004,39(10) : 1235-1242. 被引量:1
9A J G Babu, Nalina Suresh. Project management with time, cost, and quality considerations [ J ]. European Journal of Operational Research, 1996, 88 (2): 320-327. 被引量:1
10Do Ba Khang, Yin Mon Myint. Time, cost and quality tradeoff in project management: a case study [J]. International Journal of Project Management, 1999, 17 (4) : 249-256. 被引量:1