摘要
针对箱梁悬臂灌注施工中引起梁体线形变化的诸多因素,通过工程实例分析研究,阐述了施工最优控制方法,提出了使悬灌梁段的合拢精度和成桥后的线形满足设计要求的线形控制与量测的技术措施。
Pours into in the construction in view of the box girder bracket to cause girder body linear change many factors, through the project example analysis research, elaborated the construction optimum control method, proposed causes to hang fills girder part to close up the precision and the linear which after the bridge had finished satisfies the design request the linear control and the gauging technical measure.
出处
《山西建筑》
2006年第18期310-311,共2页
Shanxi Architecture
关键词
箱梁
悬臂灌注
线形
控制
技术
box girder, pour into girder bracket, linear, control, technology